Sterling

Architecture

RCMP DETACHMENT 2006
Pukatawagan, MB
by Calnitsky Associates Architects Inc.

A 5,490 sq.ft. (510 sq.m.) modular building that contains 4 cells with necessary facilities.

Responsibilities: Project Coordinator.
Actively involved in preliminary drawings and code analysis, design development drawings, working
drawings and project coordination.

Sorry, you have not enough rights to view this image.BRANDON POLICE SERVICE BUILDING  2009-10
Brandon, MB

 

This 48,000 sq.ft. building contains high security facilities, offices, garage, public and service areas.

Responsibilities:
As a part of the design team I was actively involved in preparation of contract documents.

 

*Architect: Calnitsky Associates Architects Inc.

Associate Architect: James Kacki Architect Planner

RCMP WOLLASTON LAKE 2010 - 2012
Wollaston Lake, Saskatchewan
by Calnitsky Associates Architects Inc.

Addition/Renovation to existing RCMP detachment.

Responsibilities: Project Coordinator
Preliminary design, design development, working drawings, tender phase and contract admin during
construction.